North West Hospital & Health Service Carpark Project Ugprade 2017

Price: $300,000 to $400,000 35tonne

Scope of Work: Design & Construct Large Structural awnings located at the Mount Isa Hospital.
Site Measure project, design carpark and structural layout
Fabricate structural steel
Apply surface protect and deliver
Excavate large footings, concrete cages & Anchor bolts
Apply concrete pedestals and structural members
Install roof drainage
Lead time: 60 days
Referee: Scott Lithgow – Maintenance Manager – 0419 955 426

Mount Isa McDonalds Upgrade 2016

Price: $100,000

Scope of Work: Site Measure, design supply shop drawings, fabricate and erect steel works.
Structural: Working with engineers to fabricate and install structural works
Remove walls, strengthen members
2 X Drive through Awnings:
Site measer, fabricate and erect – lead time of installation 4 hrs
Playground Upgrade:
15 day lead time – Site measure, supply shop drawings, fabricate & install
Working with high traffic areas with vehicle and human interaction
Lead Time: Shope drawings – 4 days, Fabrication – 5 days, Remove existing structure – 2 days, erect new structure – 4 days.
Referee: Andrew Murchie – Manager Director Murchie Construction Pty Ltd 0419 646 574

Cudeco Mine Crusher Bin Grizzly 2016

Price: $100,000 to $200,000

Scope of Work: Site Measure, fabricate and erect large crusher grizzly
(Design failed) designed by Cudeco Mine – Working with tight deadlines from receipt of purchase order, the Grizzly was completed within 15 days.
Site measure, supply shop drawings, fabricated and installed at Cudeco Mine.
Erect & install Grizzly – 12 Hrs.
Referee – Lance Goodmen Mine Manager – 0499 949 125

Mount Isa City Council New Inlet Structure 2015

Price $200,000 to $300,000

Scope of work: Supply Shop drawings, fabricate and erect new inlet structure.
Supply shop drawings
Fabricate all structural steel members
Galvanised dip all material & transport to site
Erect large stainless-steel tanks and structural works
Lead time: 60 Days
Referee – Ricardo Marion, Mount Isa City Council Manager technical Services – 0427 379 260

Lady Loretta Maintenance Workshop awning 2015

Price: $100,000 to $150,000

Scope of Work: Design, site measure, supply shop drawings, fabricate and erect.
75 km north of Mount Isa we designed the site measured a large awning to shelter a 6-bay Maintenance shed.
Fabricated and delivered.
The install of steel work was completed over 4 night shifts, working close with operators & maintenance crew to ensure the flow of servicing equipment was not affected.
Referee – Rob Brown – Maintenance Manager 0427 874 638

Lady Loretta Maintenance Workshop awning 2015

Price: $100,000 to $150,000

Scope of Work: Design, site measure, supply shop drawings, fabricate and erect.
75 km north of Mount Isa we designed the site measured a large awning to shelter a 6-bay Maintenance shed.
Fabricated and delivered.
The install of steel work was completed over 4 night shifts, working close with operators & maintenance crew to ensure the flow of servicing equipment was not affected.
Referee – Rob Brown – Maintenance Manager 0427 874 638